Dairygold Head Office
Dairygolds head office at Clonmel Road Mitchelstown installed a mixture of 600*600 45 watt and 1200*600 90
Dairygolds head office at Clonmel Road Mitchelstown installed a mixture of 600*600 45 watt and 1200*600 90
This sports hall used our Tecoled 200w LED High Bay as a replacement for 400w Metal Halide
This Plant made the change from T8 fluorescent tubes to Tecoled LED lighting and saved over €14,000